Kent Avenue Bridge Replacement (Streambed Alteration Agreement No. 1600-2020-0042-R2)
3 Documents in Project
Summary
SCH Number
2019012057
Lead Agency
Sutter County
Document Title
Kent Avenue Bridge Replacement (Streambed Alteration Agreement No. 1600-2020-0042-R2)
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2020
Document Description
The project is limited to the construction of a replacement bridge for the Kent Avenue Bridge, over the Sutter Butte Irrigation Canal. The existing bridge is 42-feet long and 28-feet wide and is composed of four 90-inch diameter corrugated metal pipes with headwalls. The bridge will be replaced in approximately the same location with the roadway approaches widened to provide a tapered transition to the new structure. It is anticipated the new bridge will consist of reinforced concrete abutments supporting precast concrete voided slabs clear spanning the canal. The width of the new structure will be approximately 33-feet, including two 11-foot lanes, two 4-foot shoulders, and two 1.5-foot wide railings. The length of the replacement bridge will be 61-feet.
Contact Information
Name
Zach Kearns
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
David Tomm, County of Sutter, Development Service Department
Contact Types
Project Applicant
Location
Coordinates
Cities
Live Oak
Counties
Sutter
Regions
Northern California
Cross Streets
off Kent Ave
Waterways
Sutter Butte Canal
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No