Development Code Text Change 668.15, CUP No. 16-04, Tentative Parcel Map 16-02 (Lemoore Cooler, LLC)

Summary

SCH Number
2018121027
Lead Agency
Kings County
Document Title
Development Code Text Change 668.15, CUP No. 16-04, Tentative Parcel Map 16-02 (Lemoore Cooler, LLC)
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
exclusive ag, exclusive ag: present use of land was previous cold storage facility
Document Description
The proposed system will receive energy from the existing PG&E utility line and store the energy in battery modules until it is distributed into the existing PG&E Henrietta Substation. Each phase will take approx three months to construct. The initial system (phase 1) will be able to deliver 10 megawatts of power for up to four continuous hours, resulting in a capacity of 40 megawatt-hours of stored energy available for grid services and system reliability. The system constructed in phase 1 will consist of forty shipping containers containing six energy storage sub models with AC/DC inverters each. Underground low voltage cables will be run to a low profile, pad-mounted switchgear and then to a pad-mounted step-up transformer. The transformer will be located at the northwest corner of the parcel, where underground 12 kV cables would be routed to banks 3 and 5 of PGE's Henrietta 12 kV substation, less than a mile to the north of the proposed project site. As additional storage capacity is needed, phase 2-6 will be constructed with the following infrastructure and storage capabilities: - phase 2: 112 DC Battery Modules, 15 transformers, 18 switchgears for a total storage capacity of 40 megawatts, or 160 megawatt hours. - phase 3 through 6, each: 152 DC Battery Modules, 20 transformers, 24 switchgears, for a total storage capacity of 60 megawatts, or 240 megawatt hours each (technology advancements are being considered, therefore the modules will increase its energy density over the years).

Contact Information

Name
Chuck Kinney
Agency Name
Kings County
Contact Types
Lead/Public Agency

Location

Cities
Lemoore
Counties
Kings
Cross Streets
25th Ave and Avenal Cutoff Road
Zip
93245
Total Acres
20
Parcel #
024-190-069
State Highways
198
Township
19S
Range
19E

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Emergency Services, California, Office of Historic Preservation, Resources Agency
Development Types
Other (Battery energy storage system with land division)
Local Actions
Use Permit, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print