San Joaquin Phase 2 Water System Improvement Project

4 Documents in Project

Summary

SCH Number
2018121015
Lead Agency
City of San Joaquin
Document Title
San Joaquin Phase 2 Water System Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2020
Document Description
The Project will involve installing a new well (Well #6), a 71,000-gallon tank for backwash storage and sludge settling and associated filtration equipment, approximately 2,300 linear feet of 10- inch diameter pipeline to convey raw ground water from Well #4 to Well #6, approximately 700 feet of 12-inch pipeline to connect Well #f; to the existing water distribution system, and approximately 400 feet of 6-inch sewer pipe to connect the new well filtration system to the existing sewer system to dispose of manganese sludge. In addition, approximately 1,620 feet of new &-inch water main will be installed and approximately 8,200 feet of existing 6--inch water main will be replaced.

Contact Information

Name
Diana Brooks
Agency Name
City of San Joaquin
Contact Types
Lead/Public Agency

Name
Agency Name
City of San Joaquin
Contact Types
Project Applicant

Location

Cities
San Joaquin
Counties
Fresno

Notice of Determination

Approving Agency
City of San Joaquin
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print