San Joaquin Phase 2 Water System Improvements Project

4 Documents in Project

Summary

SCH Number
2018121015
Lead Agency
City of San Joaquin
Document Title
San Joaquin Phase 2 Water System Improvements Project
Document Type
ADM - Addendum
Received
Present Land Use
Existing water treatment plant and roadway (for pipeline)/ LM - Light Manufacturing/ public ROW (pipelines)
Document Description
This is an addendum to the original MND. After filing the Notice of Determination, minor changes were made to the Project which included removing some additional pipelines that were not originally included in the 15/MND and adding some additional pipelines that were within the areas that were analyzed in the Project 15/MND. The analysis was consolidated under this Addendum. The Project will involve installing a new well (Well #6), a 71,000-gallon tank for backwash storage and sludge settling and associated filtration equipment, and various new or replacement pipelines in existing roadways to accommodate the Project. These infrastructure improvements will help the City reliably meet the maximum daily demand of 1,500 Gallons Per Minute (GPM) and the peak hour demand of 3,339 GPM.

Contact Information

Name
Lupe Estrada
Agency Name
City of San Joaquin
Contact Types
Lead/Public Agency

Name
Agency Name
City of San Joaquin
Contact Types
Project Applicant

Location

Cities
San Joaquin
Counties
Fresno
Regions
Citywide
Zip
93660
Parcel #
Public ROW and City-owned
Schools
San Joaquin Elementary School
Waterways
Various Canals
Township
15S
Range
16E
Base
MDB&M
Other Location Info
Acres: linear - 2,700 ft Sections: 23,24,25

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Water Resources (DWR), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, District 23, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Transportation, District 6 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 6 (DOT)
Development Types
Other (Water treatment upgrade I pipeline)
Local Actions
Water Treatment
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Download CSV New Search Print