Biggs Water Tank Project

2 Documents in Project

Summary

SCH Number
2018112027
Lead Agency
City of Biggs
Document Title
Biggs Water Tank Project
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2018
Present Land Use
vacant building and gravel; Z: Public/quasi-public; GPD: Ag industrial
Document Description
The proposed project is the installation of ground-level 1.5-million gallon water storage tank, pump/control building, an 8-inch water line extension, and emergency power generator. The new water line would connect the tank to an existing water line in West Biggs Gridley Road on the north side of the Reclamation District 833 Main Drainage Canal. The line would be installed along the west side of the bridge where it crosses the canal. No permanent features would be constructed in the canal. A groundwater production well would also be constructed to replace on off-site well. No new groundwater development is proposed.

Contact Information

Name
Bob Summerville
Agency Name
City of Biggs
Contact Types
Lead/Public Agency

Location

Cities
Biggs
Counties
Butte
Cross Streets
2837 West Biggs Gridley Rd
Zip
95917
Total Acres
~5
Parcel #
022-140-009
State Highways
99
Railways
UPRR
Schools
Biggs HS, ES
Waterways
Hamilton Slough/Main Drainage Canal
Township
18N
Range
2E
Section
23
Base
MDBM

Notice of Determination

Approving Agency
Biggs City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes