SR-1 (PCH) Drainage Restoration Project and Bridge Replacement at Solstice Canyon Creek
4 Documents in Project
Summary
SCH Number
2018111004
Lead Agency
California Department of Transportation, District 7
Document Title
SR-1 (PCH) Drainage Restoration Project and Bridge Replacement at Solstice Canyon Creek
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2019
Document Description
Caltrans proposes a drainage restoration project at 19 locations on SR-1/PCH in the cities of Los Angeles, Malibu, and unincorporated areas within Los Angeles County (post miles 37.67 to 62.86) and Ventura County (post miles 0.00 to 0.92). Improvements Include repair/rehabilitation of existing drainage facilities to restore full functionality, and also includes replacement of the existing bridge/culvert at Solstice Canyon Creek with a new bridge structure with an underlying natural slope creek bottom to provide improved flood water conveyance, and to improve hydraulic conditions to facilitate movement of the endangered Southern steelhead trout population in the project study area.
Contact Information
Name
Eduardo Aguilar
Agency Name
Caltrans
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Caltrans
Contact Types
Project Applicant
Location
Cities
Los Angeles, Mailbu
Counties
Los Angeles, Ventura
State Highways
SR-1
Notice of Determination
Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes