Alamitos Bay Pump Station, Discharge Line Replacement Project
2 Documents in Project
Summary
SCH Number
2018101052
Lead Agency
Los Angeles County
Document Title
Alamitos Bay Pump Station, Discharge Line Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2020
Document Description
The project will replace and upgrade aging facilities to increase system reliability during storms. It consists of removing the existing discharge structure (including all timber piles and beams, temporary support crib wall elements, walkway assembly, lifeguard observation cabin, three reinforced concrete pipe lines and existing utility conduits attached to the structure), and replacing it with new buried discharge pipes and a concrete outlet structure supported on driven piles. In addition, the project will include work to the existing County pump station facility that consists of removing the existing pump station roof and installing a new steel frame roof, 3 feet higher than existing height to accommodate a new bridge crane. Also, the existing office, bathroom and associated amenities, and all pump station access doors will be replaced; and electrical service disconnection and re-connection and lighting upgrades will be performed.
Contact Information
Name
Ebigalle Voigt
Agency Name
County of Los Angeles Department of Public Works
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
County of Los Angeles Department of Public Works
Contact Types
Project Applicant
Location
Cities
Long Beach
Counties
Los Angeles
Notice of Determination
Approving Agency
County of Los Angeles Department of Public Works
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No