Foothill Sanitary Landfill Module 2B Expansion Project
2 Documents in Project
Summary
SCH Number
2018092015
Lead Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento
Document Title
Foothill Sanitary Landfill Module 2B Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2018
Present Land Use
A/G
Document Description
Expansion of Foothill Sanitary Landfill operations into Module 2B, comprising approx 23.92 acres south of existing landfill operations. Module 2B will be constructed as a lined waste unit. The project will operate pursuant to Foothill Landfill's existing regulatory approvals, including the Solid Waste Facilities Permit issued by the San Joaquin County Environmental Health Department. The project entails the excavation of material to construct the base of the unit, foundation preparation, liner installation, installation of a leachate collection system, and final grading. The project will be constructed using typical excavator equipment.
Contact Information
Name
Nicholas White
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Joaquin
Cross Streets
6484 North Waverly Rd
Zip
95236
Total Acres
23.92
Parcel #
093-44-01
Township
2N
Range
9E
Section
13
Other Location Info
Linden
Notice of Determination
Approving Agency
Central Valley regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.