Rio Cosumnes Correctional Center Substation Project
2 Documents in Project
Summary
SCH Number
2018082017
Lead Agency
Sacramento Municipal Utility District
Document Title
Rio Cosumnes Correctional Center Substation Project
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2018
Present Land Use
cemetery, public & quasi-public; ag cropland
Document Description
SMUD is proposing to construct a new 12.5 MVA substation for the RCCC on Sacramento County-owned land for the purpose of ensuring adequate and reliable power for the RCCC's planned and future expansion projects. The new substation would be directly north of the RCCC facility and accessed by a new 30-foot wide service road off of Bruceville Rd.
The project would also include 1.5 miles of new 69-kilovolt subtransmission line on the east side of the Bruceville Rd right of way; extending from the existing 69-kV subtransmission line at the Bruceville and Twin Cities intersection. The 1.5 miles of new subtranmission line includes a new underground portion of up to 1,600 feet. An existing 12-kV distribution line along this same alignment would be reconstructed to replace the current line poles with taller ones to allow for sufficient space to add the new single-circuit 69-kV subtransmission line above the 12-kV line. The new underground portion for the 69-kV subtransmission line would be situated directly east along the eastern edge of the Bruceville Road ROW within a new 25-foot wide SMUD easement on private agricultural land. The existing 12-kV underground distribution line would remain at its current location. It should be noted that if the underground 69-kV subtransmission line is not permissible on the east side of Bruceville Road, then underground portion for the 69-kV subtransmission line would be proposed on the west side of the Bruceville Road ROW, and two additional riser poles would be required for overhead crossing.
Contact Information
Name
Jerry Park
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Elk Grove
Counties
Sacramento
Cross Streets
Bruceville Rd between Lambert Rd & Twin Cities Rd; east of Franklin Rd
Zip
95757
Total Acres
0.98
Parcel #
146-0050-082
Airports
Franklin Field
Notice of Determination
Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.