Bayshore Bikeway: Barrio Logan Segment
Summary
SCH Number
2018078519
Public Agency
San Diego Association of Governments
Document Title
Bayshore Bikeway: Barrio Logan Segment
Document Type
NOE - Notice of Exemption
Received
Posted
7/30/2018
Document Description
The proposed project is located south of Downtown San Diego. The proposed alignment for the bike path would extend along the western side of Harbor Drive from Park Boulevard to Cesar Chavez Parkway and then cross to the eastern side of Harbor Drive and continue to 32nd Street within the existing road right of way. The proposed project would provide approximately 2.5 miles of shared-use, Class I bicyle and pedestrian path and related roadway modifications necessary to accomodate the bikeway, including signage, relocation of existing utilitirs and storm drains, repaving, street lighting, and other similar improvements.
Contact Information
Name
Keith Greer
Agency Name
San Diego Association of Governments
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Cross Streets
west of Harbor Dr from Park Blvd tp Cesar Chavez Parkway, east of Harbor Dr and 32nd Street
State Highways
I-5
Waterways
east of San Diego Bay
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S: 15301,15302,15304
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.