Photovoltaic System at Helen Estock Elementary School

Summary

SCH Number
2018078029
Public Agency
Tustin Unified School District
Document Title
Photovoltaic System at Helen Estock Elementary School
Document Type
NOE - Notice of Exemption
Received
Posted
7/2/2018
Document Description
Solar arrays would be installed on top of a new elevated shade structure on a portion of the turf play field. The system would include 318 modules and produce about 112,890 watts or about 112 kilowatts of electric power. Approximately 415 feet of electrical conduit would be installed in a buried trench from the structure, through the campus, to the school's existing electrical system at the front of the school. The photovoltaic system and shade structure would be a campus improvement, and its beneficiaries include the school's students, faculty, and staff and members of the community.

Contact Information

Name
David Miranda
Agency Name
Tustin Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Tustin
Counties
Orange
Cross Streets
14740 North B Street

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
S: 21080.35
Reasons for Exemption
Solar energy systems installed on an existing parking lot are statutorily exempt. The project involves installation of a solar energy system on an existing parking lot. The shade structure and electrical connections would be installed in previously disturbed areas of a developed school campus and the PV system would be appurtenant to the existing school facility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print