Atascadero Creek at Via Avenue Bridge Replacement Project
2 Documents in Project
Summary
SCH Number
2018062010
Lead Agency
City of Atascadero
Document Title
Atascadero Creek at Via Avenue Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2018
Present Land Use
industrial, open space, medium density residential
Document Description
The city public works dept is proposing to replace the Atascadero Creek Bridge (Existing Bridge Number 49C-158) over Atascadero Creek on Via Ave. The existing bridge does not meet current design standards and is considered functionally obsolete. The proposed project includes demolition and removal of the existing bridge superstructure and foundations and installment of a 74-ft long, single-span, cast-in-place post tensioned concrete slab bridge with no approach slabs. The project would require temporary detours during the 6-8 month construction period. The new bridge structure would be widened to meet current standards but the project would not increase the number of travel lanes or capacity on the bridge.
Contact Information
Name
Ryan Hayes
Agency Name
City of Atascadero
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Atascadero
Counties
San Luis Obispo
Cross Streets
Via Avenue, Traffic Way
Zip
93422
Total Acres
2.67
State Highways
US 101, CA-41
Railways
UPRR
Schools
Atascadero MS
Waterways
Atascadero Creek
Township
28S
Range
12
Section
15
Base
MDM
Notice of Determination
Approving Agency
City of Atascadero
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No