Ebbetts Pass Reach 1 Water Transmission Pipeline Capital Improvement Project

3 Documents in Project

Summary

SCH Number
2018052042
Lead Agency
Calaveras County Water District (CCWD)
Document Title
Ebbetts Pass Reach 1 Water Transmission Pipeline Capital Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2018
Present Land Use
ROW, GF
Document Description
The Calaveras County Water District is proposing approx 24,500 lf of new water pipeline, hydrants, blow-off valves, and main line valves to replace existing facilities constructed in 1965. Except for a +/-1,080 ft long section of pipeline near the Hunter Dam WTP, the existing Ebbetts Pass Reach 1 pipeline is located within Caltrans SR-4 ROW. The alignment is from approx PM 32.3 (West of Forest Meadow) to PM 37.0 (near Hunter Dam Rd, just west of Avery, CA). The replacement pipeline will also be placed within the SR 4 ROW and constructed as close as practical to the existing pipeline, which is primarily located past edge of pavement within the south shoulder.

Contact Information

Name
Charles Palmer
Agency Name
Calaveras County Water District
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Zip
95249
Total Acres
4.5 linear mi
State Highways
Hwy 4
Waterways
Mill Creek
Other Location Info
Forest Meadows

Notice of Determination

Approving Agency
Calaveras County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print