Narrows 2 Mitigation Plan
6 Documents in Project
Summary
SCH Number
2018042077
Lead Agency
Yuba County Water Agency
Document Title
Narrows 2 Mitigation Plan
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2018
Present Land Use
RR District-5 acres and small portion of residential estate district
Document Description
YCWA proposes the Narrows 2 Mitigation Plan, which involves the placement of 30 pieces of large woody material (LWM) in the Yuba River, blow Englebright Dam at three locations. The proposed project will provide improved habitat for juvenile anadromous fish in the Yuba River, as mitigation for a 2015 minimum instream flow violation that resulted in harm to anadromous fishes.
LWM will be placed and anchored along the water's edge, facing downstream at an approx. 45-degree angle to the stream bank. LWM will be buried in the streambank using excavated soil or anchored with boulders, t-posts, rebar, or other poles/stakes driven below grade. The Project is estimated to take one to three weeks to complete, and will occur during the low flow period between July through September to minimize in-water work and potential impacts to anadromous fishes. The Project requires certification by the SWRCB pursuant to Clean Water Act.
Contact Information
Name
Philip Choy
Agency Name
SWRCB
Contact Types
Lead/Public Agency
Phone
Location
Counties
Yuba
Zip
95918
Total Acres
71
Parcel #
005-290-005-000, -008-000
State Highways
20
Waterways
Yuba River
Other Location Info
Smartsville
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.