Orange High School Modernization Project
Summary
SCH Number
2018038201
Public Agency
Orange Unified School District
Document Title
Orange High School Modernization Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/9/2018
Document Description
The proposed project is the modernization of Orange High School. The improvements would be constructed in two phases. Phase 1 would be implemented in two increments. increment 1 improvements includes demolition of a snack bar and shed; relocation of five portables; construction of a new one way driveway for school bus loading, a satellite kitchen, and a utility yard; and modification of rear service windows on the existing cafeteria. Increment 2 improvements includes demolition of the eastern parking area and construction of a new 42,300 square foot science, technology, engineering, and math building. Phase 2 would be implemented under one of two scenarios. Scenario A, buildings 100 and 200 would be demolished and reconstructed. In scenario B the interiors of buildings 100 and 200 would be renovated.
Contact Information
Name
Ronald Lebs
Agency Name
Orange Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Orange
Counties
Orange
Cross Streets
525 North Shaffer Street
Parcel #
386-241-08, -09, -10, 386-231-17
Schools
Orange High School
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S: 15314
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.