Earthrise Nutrionals, LLC's Evaporation Pond 8 Project, Calipatria Facility
2 Documents in Project
Summary
SCH Number
2018031071
Lead Agency
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert
Document Title
Earthrise Nutrionals, LLC's Evaporation Pond 8 Project, Calipatria Facility
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2018
Present Land Use
micro-algae production facility/AG lud
Document Description
The proposed project consists of the construction, operation, and maintenance of a new, lined evaporation pond at the microalgae production facility owned/operated by Earthrise Nutritionals. The pond will be built on the applicant's 189-acre existing facility and will be used to receive wastewater generated by the harvesting of algae from the Spirulina Harvest Plant Facility and its Linablue Extraction Facility. The SHPF and LBEF are also located at the project site. The annual wastewater discharged to the Pond from the two processes will be approx 16.6 M gallons.
Contact Information
Name
Scot Stormo
Agency Name
Regional Water Quality Control Board, Region 7 (Colorado River B
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Calipatria
Counties
Imperial
Cross Streets
113 E. Hoober Rd at Hwy 111
Zip
92233
Total Acres
14
Parcel #
047-01016, 022-140-015-0000
State Highways
SR 111
Waterways
IID Drainage Canals
Township
11S
Range
14E
Section
33,34
Base
SBBM
Notice of Determination
Approving Agency
RWQCB, Colorado River Basin
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No