City of Avenal Water Transmission Line Replacement Project (Project)

3 Documents in Project

Summary

SCH Number
2018031040
Lead Agency
City of Avenal
Document Title
City of Avenal Water Transmission Line Replacement Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2020
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes construction of a four-mile 18-inch pipeline within the existing Right-of-Way (ROW) easement along State Route 269, between Interstate Highway 5 and Skyline Drive. The new pipeline will replace the existing deteriorated 12-inch pipeline at the same location. All materials and staging areas will be confined to the existing ROW easement.

Contact Information

Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Avenal
Counties
Kings
Cross Streets
Interstate Highway 5 and Skyline Drive
State Highways
State Route 269

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes