18" Water Transmission Line Replacement Project
3 Documents in Project
Summary
SCH Number
2018031040
Lead Agency
City of Avenal
Document Title
18" Water Transmission Line Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2019
Present Land Use
Z: Extensive AG; GP: AG/OS
Document Description
The city proposes to install a new 18-in water transmission line to the east of SR 269 between I-5 and an existing water tank at Skyline Rd. The new pipeline would replace an existing water transmission line of the same size that is located along the same alignment.
Contact Information
Name
Fernando Santillan
Agency Name
City of Avenal
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Avenal
Counties
Kings
Cross Streets
Tank 3 at Skyline Rd
Zip
93204
Total Acres
40
Parcel #
mult
State Highways
I-5, SR 269
Notice of Determination
Approving Agency
City of Avenal Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.