South Avenue Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2018-0224-R2)
4 Documents in Project
Summary
SCH Number
2017122022
Lead Agency
City of Jackson
Document Title
South Avenue Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2018-0224-R2)
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2018
Present Land Use
ROW
Document Description
CDFW has executed Lake and Streambed Alteration Agreement number 1600-2018-0224-R2, pursuant to section 1602 of the Fish and Game Code to the project applicant, City of Jackson.
This project is limited to the removal of an existing bridge on South Avenue spanning jackson Creek. Jackson Creek will be realigned to remove a sharp bend directed at Highway 49 and the embankments will be regraded to 2:1 slopes, borth and south of the new bridge location. A total of 0.036 acres of Jackson Creek will be permanently impacted and a total of 0.144 acres of channel will be created due to the realignment. A new double lane bridge will be installed over Jackson Creek in a different alignment and will intersect with Highway 49. Relocating and/or replacing existing utilities will be associated with this work and will include improvements to an adjacent shopping center parking lot, restriping existing roadways, and relocating overhead electrical utilities. Water will be diverted during all work within the stream if water is present. The project will involve the removal of five trees, each over 8-inches in diameter.
Contact Information
Name
Ian Boyd
Agency Name
CDFW, North Central region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Jackson
Counties
Amador
Cross Streets
South Ave.
Zip
95642
Parcel #
ROW
State Highways
49
Waterways
Jackson Creek
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.