Sweetwater Dam and South Dike Improvement Project
5 Documents in Project
Summary
SCH Number
2017111066
Lead Agency
Sweetwater Authority
Document Title
Sweetwater Dam and South Dike Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2018
Present Land Use
S80 - Special purpose
Document Description
CDFW is intending to execute a Lake or Streambed Alteration Agreement pursuant to section 1602 of the Fish and Game Code (#1600-2018-0142-R5) to the project applicant, Sweetwater Authority. Project activities include raising the existing parapet walls on the north and south ends of the Sweetwater Dam, repairing the existing South Spillway, raising the existing South Dike, and crossing two drainages with the South Abutment Access Road. Improvements to the parapet walls will not impact the reservoir or stream, as the work will as occur on the existing dam structure. Construction on the South Spillway will involve 0.17 acre of work on the existing concrete-lined structure to repair substantial concrete deterioration including primary and secondary cracking, general spalling, and deterioration of the foundation support beams. The footprint of the structure will not be changed. Permanent impacts (0.06 acre) will result from the installation of type-3 drain gravel with 4" aggregate base in two small ephemeral drainages for the South Abutment Access road, and from the footprint associated with raising the South Dike, which overlaps with a small portion of the sediment/drainage basin located at its base. Shoreline areas delineated as jurisdictional Open Water of the reservoir but above the actual water level at the time of work will be temporarily impacted by work on the South Dike and as equipment and materials staging for dam improvements.
Contact Information
Name
Kelly Fisher
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
100 Lakeview Ave
Zip
91902
Total Acres
15.18
Parcel #
5851610100, 5851001500
State Highways
54, 125
Schools
La Presa, Audubon ES
Waterways
Sweetwater Reservoir, Sweetwater River
Other Location Info
Spring Valley
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.