New Slater Campus Project

Summary

SCH Number
2017109015
Lead Agency
Mountain View Whisman School District (MVWSD)
Document Title
New Slater Campus Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2017
Document Description
Demolish 7 portable buildings; construct 21 classrooms and 4 toilet rooms including a two-story, 2,880 sf classroom building; a two-story, 6,240 sf classroom building, a one-story, 2,880 sf library; a one-story, 2,880-sf administration building; a one-story 6,288 sf multi-use room; and three one-story, 960-sf "flex" portable classrooms. Site development would include 27,000 sf of building blueprint, 17,500 sf of concrete paving; 54,300 sf of asphalt paving; 112,000 sf of play fields; and 9,000 sf of landscaped area. A pick-up and drop-oof loop and 48-space parking lot would be included. 20 trees would be removed and student capacity would be 450 students with 25 staff members.

Contact Information

Name
Robert Clark
Agency Name
Mountain View Whisman School District
Contact Types
Lead/Public Agency

Location

Cities
Mountain View
Counties
Santa Clara

Notice of Determination

Approving Agency
Mountain View Whisman School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print