Cont.: delivered to Tulare Lake Basin Water Storage District (TLBWSD) (SWPAO #17025).

1 Documents in Project

Summary

SCH Number
2017098105
Public Agency
California Department of Water Resources (DWR)
Document Title
Cont.: delivered to Tulare Lake Basin Water Storage District (TLBWSD) (SWPAO #17025).
Document Type
NOE - Notice of Exemption
Received
Posted
9/6/2017
Document Description
TLBWSD will take delivery of up to 4,000 acre-feet of CVP water under article 55 of its State Water Supply Contract. The water is stored in San Luis Reservoir on behalf of Fresno Slough Water District and will be made availabe by Reclamation at O'Neill Forebay for subsequent delivery by DWR to TLBWSD. The water will be conveyed through the California Aqueduct and delivered to Angiolo Water District, a member unit of TLBWSD, from Reach 3 to Reaches 8C and 8D.

Contact Information

Name
Geoff Shaw
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Counties
Kings

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
a. State water project long-term water supply contract includes provisions for conveyance of non-project water to SWP contractors. b. No construction is required to implement the proposed delivery. c. The facilities are existing facilities that have not been expanded or modified to implement the proposed change in points of delivery. d. There will be no change in land use. e. The water will be stored to firm up existing supplies in years of shortage, not to expand use.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print