Phase II Main Avenue Elementary School Reconstruction Project

Summary

SCH Number
2017098104
Public Agency
Robla School District
Document Title
Phase II Main Avenue Elementary School Reconstruction Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/6/2017
Document Description
The proposed project includes (1) the construction of 8 classrooms and (2) the removal of the remaining nine portables from the site. The proposed project will result in a temporary increase of up to 100 students for an approximate 24- to 36-month duration while the existing portables remain in use following the construction of the new building. Following the completion of the proposed project (i.e. after the removal of the nine portables), the student capacity of the school will be approx 375 students, less than the existing approx 400 student capacity.

Contact Information

Name
Ruben Reyes
Agency Name
Robla School District
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15314
Reasons for Exemption
The project meets the minor addition to schools exemption which includes minor additions to schools within existing school grounds where the addition does not increase student capacity by more than 25% or 10 classrooms, whichever is less.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print