Pond A18 South Gate Levee Repair (Lake or Streambed Alteration Agreement No. 1600-2017-0399-R3)

2 Documents in Project

Summary

SCH Number
2017082053
Lead Agency
City of San Jose
Document Title
Pond A18 South Gate Levee Repair (Lake or Streambed Alteration Agreement No. 1600-2017-0399-R3)
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2018
Present Land Use
Z: Ag; GP: open space parklands & habitat on east side/Pond 18A and public quasi public on west side Artesian Slou
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0399-R3, pursuant to section 1602 of the Fish and Game Code to the project applicant, City of San Jose. Project includes erosion repair to existing levee by installing 167 feet of sheet piles on both the west and east sides of the levee, north and south of the Pond A18 South Gate. Location of the sheet piles will be within the levee, between the levee crown and levee slope (not installed in water). The steel sheet piles will be driven using a vibratory pile driver. The levee crown will be regraded and voids between the sheet pile and the remaining section of levee will be backfilled with rock aggregate.

Contact Information

Name
Kristin Garrison
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
700 Los Esteros Rd
Zip
95134
Other Location Info
Alviso

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No