London Community Services District Water System Reliability Project
3 Documents in Project
Summary
SCH Number
2017081032
Lead Agency
London Community Services District
Document Title
London Community Services District Water System Reliability Project
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2017
Present Land Use
London CSDs GPD: Census Designated palce. Primary LU: Res;
Document Description
Proposed project includes equipping the existing Well No. 5 located on property currently owned by the District at parcel No. 043-082-027 (off Sarah Road) with a new pump, booster pump system, hydro-pneumatic tank, electrical controls and an emergency generator, constructing a ground level steel water storage tank approx. 900,000 gallons in volume, site work, and a Supervisory Control and Data Acquisition (SCADA) system, and replacing approx. 12,000 linear feet of existing pipeline with 8" diameter PVC pipeline, fire hydrants, sectionalizing valves, water services, and other incidental items for a fully functioning water storage and distribution facility.
Contact Information
Name
Carolyn Thomas
Agency Name
London Community Services District
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Dinuba
Counties
Tulare
Cross Streets
Avenue 376 and Rd 60
Zip
93618
Total Acres
384
Parcel #
043-082-0277
Township
18S
Range
25E
Section
2
Base
MDM
Notice of Determination
Approving Agency
London CSD Board of Directors
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.