Final Initial Study/Mitigated Negative Declaration for the Daly City Expanded Tertiary Recycled Water Project

2 Documents in Project

Summary

SCH Number
2017072053
Lead Agency
Daly City
Document Title
Final Initial Study/Mitigated Negative Declaration for the Daly City Expanded Tertiary Recycled Water Project
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2017
Present Land Use
utility ROW, Commercial, and res
Document Description
The City is located in northern San Mateo County, adjacent to the City and County of San Francisco, on the Pacific Ocean and just minutes away from SF Bay. The City, through its subsidiary, the San Mateo County Sanitation District (District) operates an existing tertiary treatment facility with a permitted capacity of 2.77 million gallons per day (mgd). This Proposed Project would add a new tertiary treatment process to provide an additional 3.0 mgd of tertiary treatment capacity during the irrigation season. The average yearly capacity of the system is 1.25 mgd or 1,400 acre-feet per year (afy) because the system will only operate during the irrigation season. The new treatment processes would include pressure membrane filtration followed by ultraviolet (UV) disinfection due to the small site constraints. New pipelines, pump stations and offsite storage would be constructed to complete the recycled water distribution system, delivering water to new customers for irrigation purposes in lieu of groundwater pumping. The purpose of the proposed project is to reduce irrigation reliance on the groundwater basin; provide local, sustainable, and drought-proof water supply; to preserve available groundwater supplies for drinking water.

Contact Information

Name
Patrick Sweetland
Agency Name
North San Mateo County Sanitation District
Contact Types
Lead/Public Agency

Location

Cities
Colma, Daly City
Counties
San Mateo
Cross Streets
Lake Merced Blvd
Zip
94015

Notice of Determination

Approving Agency
North San Mateo County Sanitation District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print