Long Beach Municipal Urban Stormwater Treatment (MUST)

3 Documents in Project

Summary

SCH Number
2017071068
Lead Agency
City of Long Beach
Document Title
Long Beach Municipal Urban Stormwater Treatment (MUST)
Document Type
NOD - Notice of Determination
Received
Posted
2/20/2020
Present Land Use
open space and industrial facility
Document Description
The Long Beach Municipal Urban Stormwater Treatment (LB-MUST) project will construct a centralized water treatment facility with an educational component, a brackish water 1- acre wetland, and with landscaped trails that lead to the California Coastal Trail in a community that is severely disadvantaged. The LB-MUST will remove approximately 32,220-square foot Malibu Ceramics Works industrial facility and approximately 87,800-square feet of pavement to construct a centralized water treatment facility and a 1-acre wetland. The byproduct of the centralized water treatment facility will be recycled to sustain the 1-acre of wetland. The wetland functions as a storage basin and provides additional water treatment such as water polishing. Additionally, the wetland provided a continuation of open green space with a trail between two existing City parks with a community that is severely disadvantaged. The trail connected the community to the California Coastal Trail via L.A. River Bicycle Path to expand community recreation and beach access. The City will incorporate an educational component to the project that integrated the connection between the water treatment facility operations and the wetland. The educational component is an interactive public recreation area for visitors and includes hands-on classroom opportunities, gallery exhibition for the treatment process, guides public educational tours of the treatment plant processes, and information on the low external impact development features.

Contact Information

Name
Emely Lopez
Agency Name
State Coastal Conservancy
Contact Types
Lead/Public Agency

Name
Agency Name
City of Long Beach
Contact Types
Project Applicant

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Southern California
Total Acres
3

Notice of Determination

Approving Agency
State Coastal Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print