UC Irvine Interdisciplinary Science & Engineering Building
2 Documents in Project
Summary
SCH Number
2017071051
Lead Agency
University of California, Irvine
Document Title
UC Irvine Interdisciplinary Science & Engineering Building
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2017
Present Land Use
UCI is not subject to local zoning; permitted uses in 2007 UCI LRDP allow academic facilities.
Document Description
Project would demolish an existing surface parking lot, 12B, and construct an approx. 180,000 gross sq. ft. structure on a 3.5 acre site located in the Physical Sciences Quad of the Academic Core. The structure would be 8 stories with an additional mechanical penthouse and basement level and would include wet laboratory, office, classroom/auditorium, and support space. Site improvements include paving and landscaping of the Physical Sciences pedestrian mall, along the edge of the project site, and between the project building and Physical Sciences Classroom Building and Physical Sciences Lecture Hall. The existing service road located to the east of the project site would be realigned and widened.
Contact Information
Name
Richard Demerjian
Agency Name
University of California, Irvine
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Irvine
Counties
Orange
Cross Streets
East Peltason Dr and South Circle View Dr
Zip
92697
Total Acres
3.5
State Highways
SR 73, I-405
Schools
IUSD (4); Tarbut V'Torah
Waterways
San Diego Creek
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.