Edmonston Pumpin Plant (EDPP) Vault Installation
Summary
SCH Number
2017058419
Public Agency
California Department of Water Resources
(DWR)
Document Title
Edmonston Pumpin Plant (EDPP) Vault Installation
Document Type
NOE - Notice of Exemption
Received
Posted
5/23/2017
Document Description
The San Joaquin Field Division will excavate and install a concrete vault to support the yearly EDPP sediment removal activity. Yearly sediment removal from the EDPP forebay typically requires large amount of sediment filled water to be removed and absorbed or evaporated into a nearby sediment basin. The purpose of the vault would be to support maintenance of the California Aqueduct while reducing water loss and time spent removing sediment. The State Water Project is a public utility that supports water delivery throughout the state. The people of the State of California will benefit by retaining water in the California Aqueduct for downstream delivery.
Contact Information
Name
Leah Parrilla
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Counties
Kern
Other Location Info
Mettler
Other Information
NW portion of secondary road of Edmonston Pumping Plant Aqueduct Road
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301(b)
Reasons for Exemption
This project consisits of maintenance activities that support the function of California Aqueduct and water delivery within the State Water Project. In addition, the project will not have a negative impact on surrounding environmental resources or sensitive species.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.