Dos Osos Reservoir Replacement Project
3 Documents in Project
Summary
SCH Number
2017052049
Lead Agency
East Bay Municipal Utility District
Document Title
Dos Osos Reservoir Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2017
Present Land Use
primarily residential and watershed
Document Description
EBMUD's existing 0.24-million-gallon Dos Osos Reservoir will be replaced with new dual 0.12 MG, steel-bolted reservoirs on EBMUD owned watershed property approx 70 ft higher in elevation, 300 ft southwest of the existing Dos Osos Reservoir site in the city of Orinda. A new, 12-in, inlet-outlet pipeline will be constructed to connect the existing water distribution system to the new dual reservoirs and will be located in an approx 800-ft long access road that will be constructed for permanent access from Los Norrabos to the new dual reservoirs. EBMUD's existing Dos Osos Pumping Plant, located at 263 El Toyonal, Orinda, is a 0.3-million gallons per day pumping plant that will be rehabilitated at the same capacity; however, the Dos Osos Pumping Plant will be upgraded with pump units that can pump to a higher total dynamic head to serve dual Osos Reservoirs. Upon construction completion and successful testing of the new facilities, the existing Dos Osos Reservoir will be demolished. The project would begin design in Fiscal Year (FY) 2021 followed by a two-year construction period from FY 23 to FY24.
Contact Information
Name
Chien Wang
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Orinda
Counties
Contra Costa
Cross Streets
Los Norrabos, El Toyonal
Zip
94563
Total Acres
0.5
State Highways
24
Waterways
San Pablo Creek
Notice of Determination
Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.