GWMA Recycled Water Pipelines Project in the City of South Gate
4 Documents in Project
Summary
SCH Number
2017051062
Lead Agency
Central Basin Municipal Water District
Document Title
GWMA Recycled Water Pipelines Project in the City of South Gate
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2017
Document Description
The project would consist of approx 25,325 lineal feet of recycled water pipeline varying in size from 8-in diameter to 20-in. The proposed recycled water pipeline would connect to Central Basin's existing 18-in diameter recycled water pipeline in Atlantic at Southern Place. Beginning at this intersection, the proposed 18-in diameter recycled water pipeline would extend approx 14,906 lineal feet along Southern Avenue between Park Avenue and Laurel Street. At the Alameda Corridor, the pipeline would be installed in the bridge cell. At Alameda St, the proposed recycled water pipeline would extend along Alameda St in a southerly direction to Tweedy Blvd and thence along Tweedy Blvd to the South Gate East HS, a total distance of approx 4,727 lf. The pipeline in Alameda St would also extend southerly approx 1,484 lf to Sequoia Dr and thence easterly in Sequoia Dr approx 497 lf. In addition, approx 3,711 lf of recycled water pipeline would be constructed in California Ave north from Southern Ave to South Gate City Hall. That pipeline would continue in a northerly direction to Ardmore Ave where it would then extend in a westerly direction to South Gate HS. The new recycled water system would serve South Gate Park, State Street Park, South Gate MS, Stanford Ave Park, American Apparel, Koos Manufacturing Co., South Gate City Hall, South Gate HS, and South Gate East HS.
Contact Information
Name
Keith S. Dunbar
Agency Name
Central Basin Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
South Gate
Counties
Los Angeles
Cross Streets
Southern Ave and Alameda St
Zip
90280
State Highways
105, 710
Schools
South Gate, Jordan Downs
Notice of Determination
Approving Agency
Board of Directors of the Central Basin Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.