San Juan Creek ETM Pipeline Removal (Streambed Alteration Agreement No. 1600-2017-0125-R5)

4 Documents in Project

Summary

SCH Number
2017051032
Lead Agency
Moulton Niguel Water District (MNWD)
Document Title
San Juan Creek ETM Pipeline Removal (Streambed Alteration Agreement No. 1600-2017-0125-R5)
Document Type
NOD - Notice of Determination
Received
Posted
9/21/2017
Document Description
Project is limited to the removal of 180 linear feet of an abandoned 30-inch diameter pipeline. Cement encasement will be cut at the toe of the slope, and removed through trenching. After removal, the trench will be backfilled and the open ends of the pipeline will be sealed with cement. Equipment will access the project area via the San Juan Creek Trail at Alipaz Street and all materials and equipment will be stored off-site. Implementation of the project will result in 0.03 acre (180 by 10 linear feet) of temporary impacts to the channel bottom. There are no permanent impacts as a result of project activities.

Contact Information

Name
Jennifer Turner
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Juan Capistrano
Counties
Orange
Cross Streets
Calle Perfecto and Paseo Toscana
Zip
92675
Parcel #
121-171-15, -18, -44, -668-501-02
State Highways
I-5
Railways
Burlington Northern Santa Fe
Schools
Kinoshita ES, Del Obispo ES, Marco Foster MS
Waterways
San Juan Creek and Trabuco Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.