MJ Aviles-Gonzalez Davis Red Rock Farms Water Diversion and Pond (Lake or Streambed Alteration Agreement No. 1600-2019-0192-R1)

16 Documents in Project

Summary

SCH Number
2017042022
Lead Agency
Humboldt County
Document Title
MJ Aviles-Gonzalez Davis Red Rock Farms Water Diversion and Pond (Lake or Streambed Alteration Agreement No. 1600-2019-0192-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2020
Document Description
The project is limited to 2 encroachments. POD-1 An existing water diversion from two sequential pools on unnamed class II stream. Water is gravity fed to 2 water storage tanks and water is used for domestic and irrigation purposes. The onstream pond has an existing 12-inch diameter 20-foot long plastic culvert functioning as the overflow spillway. The culvert is undersized. The notification proposes the removal of the culvert and lowering of the spillway to render the pond incapable of storing water and thus restoring unimpeded streamflow The removal and lowering of the spillway will require the removal and displacement of about 8-cubic yards of fill and 160- square feet of overall disturbance.

Contact Information

Name
Steve Lazar
Agency Name
Humboldt County Dept. of Planning and Building
Contact Types
Lead/Public Agency

Location

Cities
Garberville
Counties
Humboldt
Cross Streets
3250 Blue Rock Road
Parcel #
033-170-023
Waterways
Eel River waters
Other Location Info
An onstream pond with a culvert outflow is located 40.05180329 N, -123.7506742 W.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No