City of Fresno Northeast Surface Water Treatment Facility (NESWTF) Storage Tank Project/Supplemental Mitigated Negative Declaration
5 Documents in Project
Summary
SCH Number
2017041061
Lead Agency
City of Fresno
Document Title
City of Fresno Northeast Surface Water Treatment Facility (NESWTF) Storage Tank Project/Supplemental Mitigated Negative Declaration
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2017
Present Land Use
public facility - water recharge basin
Document Description
In order to meet the water quality requirements, customer demands, and reduce the use of groundwater, the City proposes to install a new 6 MG water storage tank to provide a total of 7.5 MG of storage capacity at the NESWTF. The new 6 Mg tank will be located on the south side of the NESWTF, where the overflow spill pond is currently located. The circular tank will be approx. 230 feet in diameter and be approx. 24 feet in height. The existing over flow/spill pond will be reconfigured to allow space for the new tank. The tank will be pre-stressed concrete structure that is buried approx. 20 feet below ground with only the top four feet exposed above ground level. Construction of the tank will require excavation to a depth of approx. 23 feet to install the foundation. Piping inlet and outlets will be installed on the bottom of the tank, requiring some limited excavations as deep as 30 feet to place these pipes.
The new tank will operate much like the existing tank, and will be configured in a similar manner. Filtered water will be fed to both tanks through a system of pipes and valves, and water from both tanks will be distributed to customers from the existing high service pump station. Hydraulic modeling will be conducted prior to construction to determine if the pumps need to be modified to accommodate the new tank. Valve and pump controls will be modified as required to accommodate the new tank.
Contact Information
Name
Dejan Pavic
Agency Name
City of Fresno
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Fresno
Counties
Fresno
Cross Streets
North Chestnut Ave and East Behymer Ave
Zip
93730
Parcel #
57802006T
Waterways
Enterprise Canal
Notice of Determination
Approving Agency
City of Fresno
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes