Pit 5 Powerhouse Access Raod Culvert Improvement Project, WDID #5A45CR00508, Montgomery Creek

Summary

SCH Number
2017028207
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Redding
Document Title
Pit 5 Powerhouse Access Raod Culvert Improvement Project, WDID #5A45CR00508, Montgomery Creek
Document Type
NOE - Notice of Exemption
Received
Posted
2/8/2017
Document Description
The PIt 5 Powerhouse Access Road Culvert Improvement Project consists of installing a larger culvert with rock and concrete retaining walls. The larger capacity culvert will reduce the risk of erosion failure of the access road and parking lot of the PG&E Pit 5 Powerhouse. The project is an improvement of an existing creek crossing. The benefits of the project include reduced interruption of access to the powerhouse and reduced potential for sediment discharges to the Pit River from erosion related failure of the crossing.

Contact Information

Name
Guy Chetelat
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency

Location

Counties
Shasta

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
Repair and improvement with negligible expansion of exisitng features that are part of a hydroelectric facility.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print