Moosa Canyon Crossing Erosion Control Project (Streambed Alteration Agreement No. 1600-2017-0033-R5)
3 Documents in Project
Summary
SCH Number
2017021019
Lead Agency
San Diego County Water Authority
Document Title
Moosa Canyon Crossing Erosion Control Project (Streambed Alteration Agreement No. 1600-2017-0033-R5)
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2017
Present Land Use
Z-Limtied ag; GP: Rural lands
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0033-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, San Diego county Water Authority.
Project is limited to stream impacts associated with the Moosa Canyon Crossing Erosion Control Project. In 2016, San Diego County Water Authority completed the Moosa Creek Pipeline Protection Project (SAA 1600-2016-0130-R5) which was an interim project that stabilized the banks and channel bottom of Moosa Creek immediately surrounding existing pipelines which cross Moosa Creek. This project will expand the stabilization and armoring of Moosa Creek in the vicinity of the pipelines. The project will install rip-rap downstream of the pipeline alignment and on the stream banks above the existing structure that was installed in 2016. The project will permanently impact up to 0.646 acre of stream habitat, and temporarily impact 0.209 acre of stream habitat. To compensate for permanent stream impacts, Permittee will deduct 1.35 of stream credits from the Permittee's Manchester Habitat Management Area. Temporary stream impacts will be restored with native vegetation upon completion of the construction project.
Contact Information
Name
Kevin Hupf
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Camino Del Rey and Aqueduct Rd
Zip
920023
Total Acres
1.81
Parcel #
1275110800
State Highways
15
Schools
Sullivan MS; Bonsall HS
Waterways
Moosa Canyon Creek
Township
10S
Range
3W
Section
35
Base
SB
Other Location Info
Bonsall
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.