UC San Diego Mesa Nuevo East Student Housing

6 Documents in Project

Summary

SCH Number
2017011048
Lead Agency
University of California San Diego
Document Title
UC San Diego Mesa Nuevo East Student Housing
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2017
Present Land Use
2004 UCSD Long range development plan LUD: Housing
Document Description
Project will redevelop 13.2 acre-parcel of existing low density apartments located in the North Mesa Housing neighborhood. The project will include 12-story, one 10-story, and two 5-story buildings with a mix of apartment types for a total of 658 units. The remaining 3.7 acres is set aside for future redevelopment. In addition to the student housing described above, the project will include a community center located adjacent to an exterior welcoming plaza and will house residential and support services. Adjacent to the project site, the Nuevo West Graduate Student Housing project will also redevelop a portion of the Mesa Housing neighborhood, and was approved as a separate project. Due to their adjacency, both projects were analyzed in the same EIR.

Contact Information

Name
Catherine Presmyk
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
Regents Rd/Miramar St
Zip
92093
Total Acres
22.6
State Highways
I-5
Railways
NCTD Coaster, Amtrak
Airports
MCAS Miramar
Schools
La Jolla Country Day
Waterways
Rose Creek
Township
15S
Range
3W
Base
LaJolla

Notice of Determination

Approving Agency
University of CA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print