Big Pine Tribal Fire Hydrant Replacement Project

Summary

SCH Number
2016128032
Public Agency
Big Pine Paiute Tribe of the Owens Valley
Document Title
Big Pine Tribal Fire Hydrant Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/5/2016
Document Description
The Big Pine Paiute tribe is replacing 38 fire hydrants on the Big Pine Indian Reservation. This project will specifically address the need for conserving water and improving emergency response infrastructure for residents and visitors of the Big Pine Indian Reservation.

Contact Information

Name
Alan Bacock
Agency Name
Big Pine Tribal Council
Contact Types
Lead/Public Agency

Location

Counties
Inyo

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15302
Reasons for Exemption
The Big Pine Tribal Council has determined that the proposed project would have no possibility of causing significant environmental impacts for the following reasons: 1) this project will replace existing hydrants 2) the project is located alongside previously disturbed areas along roadways.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print