Canyon Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0488-R3)
3 Documents in Project
Summary
SCH Number
2016112038
Lead Agency
City of Moraga
Document Title
Canyon Road Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0488-R3)
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2018
Present Land Use
Surrounding land uses: residential, public ROW, and open space/public ROW/4- and 2-lane arterial street
Document Description
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number 1600-2017-0488-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the Town of Moraga, as represented by Edric Kwan.
The project is limited to the replacement of the existing, structurally deficient approximately 104-foot long, mutlispan bridge over the West Branch of San Leandro Creek with a new multi-span bridge. The new clear-span bridge will be approx. 120 feet long and 48 feet wide to acocmodate two 12-foot travel lanes, and two 8-foot wide shoulders on both sides, and one 5-foot sidewalk for pedestrians. The replacement bridge will be located generally on the alignment as the existing bridge.
Contact Information
Name
Andrew Boertien
Agency Name
CDFW, Bay Delta Region
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Contra Costa
Parcel #
080-050-003
Schools
Joaquin Moraga
Waterways
Sycamore Creek
Township
1S
Range
1E
Section
1
Other Information
Sycamore Creek; Antioch South
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.