Zacherson Emerald Naga Farm Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0746-R1)
226 Documents in Project
Summary
SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Zacherson Emerald Naga Farm Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2017-0746-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/2/2018
Present Land Use
rural residential, agriculture, resource management/All/All
Document Description
The project consists of two encroachment: The project is limited to two encroachments. One encroachment is to maintain an existing steel railcar bridge that was re-decked in 2016. Work for this encroachment will inlude seasonal maintenance to ensure stable banks and free flow of water in the creek bed. The other propsosed encroachment is to improve and maintain an existing low water crossing. Work for this encroachment will include leveling the stream bed strata, armoring the crossing area with 6-12" cobble, filling in strata over the top of the cobbel, and rocking the approaches to the crossing with 3/4" clean road base rock. The Notification dislocses a 200 ft groundwater well for domestic and irrigation with an estimated yield of 60 gpm. A solar pump provides 15 gpm from the well. The Notification also discloses a footbridge directly upstream of the low water crossing. The bridge is supported on both banks with rock and wood footings and an additional support is in the middle of the channel, outside of the main flow. The bridge is used during rainy season. No work is proposed by the applicant.
Contact Information
Name
John Herrera
Agency Name
CDFW, Northern Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
Mendocino
Waterways
Eel River
Township
14N
Range
12W
Section
2
Base
MDB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.