Tchernitsky Doolin Creek Bridge and Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2017-0724-R1)

226 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Tchernitsky Doolin Creek Bridge and Water Diversion Project (Lake or Streambed Alteration Agreement No. 1600-2017-0724-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2020
Document Description
The project is limited to 2 encroachments. One encroachment is for water diversion from a seasonal spring on an unnamed tributary to Doolin Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Point of diversion is on APN 157-080-03. Place of use is at APN 157-080-04. The other proposed encroachment is the installation of a new 50-foot-long engineered steel bridge at a former bridge location (removed 2010, LSAA # 1600-2011-0248-R1). The bridge is part of an easement to access APN 157-080-04 which is also the place of use for the water diversion. The bridge will be installed upon pre-cast concrete and rebar abutments. Work for the project will involve removing vegetation (including one 18” DBH tan oak tree), placement of temporary fill in the channel, excavation, placement of the new bridge, backfilling, compacting, and erosion control techniques as necessary to minimize erosion.

Contact Information

Name
John Herrera
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Cities
Ukiah
Counties
Mendocino
Other Location Info
The project is located approximately 1.9 miles southwest of the City of Ukiah; affecting one unnamed tributary to Doolin Creek and Doolin Creek in the County of Mendocino, State of California; Section 30, Township 15N, Range 12W; Mt. Diablo Base and Meridian, in the Ukiah, Calif. 7.5-minute quadrangle, U.S. Geological Survey (USGS) map.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No