Arsenic Remediation New Well Project (Project)
3 Documents in Project
Summary
SCH Number
2016111012
Lead Agency
Rand Communities Water District
Document Title
Arsenic Remediation New Well Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2020
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes upgrading the existing water supply by adding an additional water source on public land to comply with federal and state drinking water standards to resolve elevated levels of arsenic in drinking water. The Project includes equipping a test well (well No. 3) as a production well and blending with water from Well No. 2 in a blending tank. A 6-inch water supply pipeline will be constructed connecting the Well No. 3 to the proposed blending tank at the existing Well No. 2. The existing pipeline at Well No. 2 will be reconfigured to discharge into the new low profile 80,000-gallon blending tank. A new booster pump station (BP) will be located at the Well No. 2 site to pump water from the blending tank into the existing 4-inch transmission main to BP No.1, and ultimately to the treated storage tanks. If necessary, chlorination will be achieved by injecting sodium hypochlorite solution into each of the raw water pipelines from Well No. 2 and Well No. 3 prior to blending. In addition, approximately 11,250 feet of 4-inch water pipeline between BP No. 1 and BP No. 2 along the north side of Redrock Randsburg Road will be replaced with a 6-inch water pipeline. The Project also includes amending the existing Right-of Way (ROW) on Bureau of Land Management land with an issuance of an access road ROW easement. Construction staging include the areas surrounding the disturbed well site, along the pipeline alignments, and along the existing ROW.
Contact Information
Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Kern
Other Location Info
501 Comstock Ave, Johannesburg, Kern County CA 93528
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes