NID Centennial Dam-Exploratory Drilling Project (Streambed Alteration Agreement No. 1600-0194-R2)
Summary
SCH Number
2016108032
Public Agency
California Department of Fish and Wildlife, Region 2
(CDFW)
Document Title
NID Centennial Dam-Exploratory Drilling Project (Streambed Alteration Agreement No. 1600-0194-R2)
Document Type
NOE - Notice of Exemption
Received
Posted
10/3/2016
Document Description
The project consists of geotechnical drilling to ensure there are no fatal flaws at the proposed dam location. The poposed plan is to drill a 5-inch diameter bore hole under the Bear River. The bore hole will be approximately 175 feet deep, angled 45 degrees southward from the drill site, which will be on the north bank of the Bear River. All work will be performed on the bank, during periods of dry weather, and is anticipated to take 6-8 days to complete.
Contact Information
Name
Amy Kennedy
Agency Name
California Department of Fish and Wildlife, Region 2
Contact Types
Lead/Public Agency
Phone
Location
Cities
Grass Valley
Counties
Nevada
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15333 - Class 1 & 33
Reasons for Exemption
The project will involve only minor alterations to land and water and will not remove any healthy, mature trees.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.