Haines Road at Wise Canal Bridge Replacement
2 Documents in Project
Summary
SCH Number
2016102023
Lead Agency
Placer County
Document Title
Haines Road at Wise Canal Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2016
Present Land Use
Rural residential
Document Description
The existing Haines Rd bridge is a single lane, single span rigid frame concrete structure that was constructed in 1930. The existing bridge is 28 ft long and 16 ft wide. The clear width of the single lane deck (between the railings) is only 13.5 ft though it serves a two lane roadway. The abutments are skewed to the roadway approximately 45 degrees, and form the sides of the Wise Canal under the bridge. The bridge replacement would be a wider, longer, single-span, precast pre-stressed voided slabs bridge on strutted abutments on essentially the same horizontal and vertical alignment as the existing bridge. The new bridge will be approximately 73 ft in length and 35.33 feet in width, with two 12 ft wide traffic lanes, two 4 ft wide shoulders, and two 1.67 ft wide bridge rails.
Contact Information
Name
Lori Perron
Agency Name
Placer County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Auburn
Counties
Placer
Cross Streets
0.3 mile northwest of intersection of Bell Rd and Haines Rd
Zip
95602
Total Acres
3.0
Parcel #
053-031-035, -072, -010-013, -010-059, 010-009
State Highways
I 80
Railways
UPRR
Airports
Auburn Municipal
Schools
Pine Hills Academy
Waterways
Wise Canal, Halsey Afterbay, Lake Arthur, Halsey Forebay, Lake Clemintine, American River, Dry C
Township
13N
Range
8E
Section
26
Base
MD
Other Information
Dry Creek, Rock Creek Lake
Notice of Determination
Approving Agency
Placer COunty Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.