Final Initial Study/Mitigated Negative Declaration for the Fairfield-Suisun Sewer District's Blower Replacement Project (2016)

3 Documents in Project

Summary

SCH Number
2016092010
Lead Agency
Fairfield Suisun Sewer District
Document Title
Final Initial Study/Mitigated Negative Declaration for the Fairfield-Suisun Sewer District's Blower Replacement Project (2016)
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2016
Present Land Use
Industrial/WWTP site
Document Description
An act of the CA Legislature in 1951 created the District to perform wastewater collection and treatment , and water recycling services for all property within the boundaries of Fairfield Suisun City, and Travis Air Force Base. The District also operates a drainage maintenance utility that performs specified stormwater management services in conjunction with the cities in its service area. Establishment of the District has enabled well-coordinated management of local wastewater and stormwater. The primary purpose of the Proposed Project/Action is to enhance the reliability and efficiency of the secondary treatment process aeration system. There are several issues with the existing aeration system including leaking air header piping, obsolete and inefficient blowers, lack of properly sized redundant equipment, and electrical gear that has exceeded its useful design life. The secondary treatment process is one of the most critical processes in the plant and any prolonged disruption to the aeration system could severely impact the District's ability to meet its discharge requirements. For these reasons, the District has decided to undertake this project.

Contact Information

Name
Hamid Sarvi
Agency Name
Fairfield Suisun Sewer District
Contact Types
Lead/Public Agency

Location

Cities
Fairfield
Counties
Solano
Cross Streets
I 80 and Chadbourne Rd
Zip
94534
State Highways
I 80 and Chadbourne Rd

Notice of Determination

Approving Agency
Faifield-Suisun Sewer District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print