ArtCenter College of Design Master Plan

6 Documents in Project

Summary

SCH Number
2016091009
Lead Agency
City of Pasadena
Document Title
ArtCenter College of Design Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2018
Present Land Use
South Campus: Institutional Use/PS or IG-SP-2-HL-56 or CD-6 Zoning/Institutional (I) Designation; Hillside Campus: Institutional Use/PS & RS2-HD Zoning/Institutional (I) Designation
Document Description
ArtCenter College of Design proposes a two phase 15-year Master Plan. Upon completion, total enrollment would increase from 2,500 full-time equivalent students to 2,500 FTE students and increase faculty/staff from 753 to 994 between the two campuses. South Campus; Phase 1 - construction of two eight-story, 100-foot tall buildings for academic programs and student housing; elevated open "quad" area over the Metro Gold Line; mobility hub below the quad area; renovation and internal floor area addition to an existing two-story building; renovation of an existing six-story building for academic purposes, and installation of an 8,000 square foot digital gallery on southeastern facade of 1111 S. Arroyo Pkwy. South campus Phase II - demolition of a one-story building and construction of four eight-story, 100-foot tall, buidings for academic programs and/or student housings and elevated "quad" area. Hillside Campus, Phase I- demolition, renovations and additions to existing buildings; installation of photovoltaic solar canopies on the existing parking lots; modifications to the parking and circulation plan. Hillside Campus Phase II - reconstruction and additions to the maintenance building. No development is proposed on the undeveloped portions of the hillside campus.

Contact Information

Name
David Sinclair
Agency Name
City of Pasadena
Contact Types
Lead/Public Agency

Location

Cities
Pasadena
Counties
Los Angeles
Cross Streets
Hillside campus: 1700 Lida Street/ South Campus South Raymond Ave, South Arroyo Parkway
Zip
91103
Total Acres
6.68, 155.95
Parcel #
5720-007-023, 5720-007-025, 5720-007-026, 5720-008-011, 5720-008-012, 5705-002-006
State Highways
I-210, SR-110, SR-2
Railways
Metro Gold Line
Schools
Blair MS and HS
Township
1N
Range
12W
Section
33/18
Base
SBM

Notice of Determination

Approving Agency
City of Pasadena
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print