1-15NTMP-001 SON Browder
Summary
SCH Number
2016079010
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
1-15NTMP-001 SON Browder
Document Type
NOD - Notice of Determination
Received
Posted
7/12/2016
Document Description
The project is limited to installation and modification of several watercourse crossings; culvert removal at Erosion Control Point (ECP) 3; culvert replacement at ECP 4 with rock armoring at the upstream inlet and a rock downspout at the outlet; installation of rock fords at ECPs 1, 2, 3, 4, 5, 7, 10, 11, 12, 13, 15, 25, 25a, 26, 27, and 28; construction of watercourse gully crossings at ECP 6 and ECP 9; gully stabilization at ECP 9a; culvert removal with a temporary crossing installation at ECP 17; and bank stabilization at ECP 25a, as denoted in the non-industrial Timber Management Plan (NTMP) 1-15NTMP-001 SON Browder.
The CDFW is executing a Lake and Streambed Alteration Agreement no. 1600-2015-0116-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Michael J. Duffy representing Redwood Empire Sawmills.
Contact Information
Name
Jeanne Wetzel Chinn
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sonoma
Other Location Info
Coleman Valley Creek
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A