Mallard Farms Pipeline Replacement Project
4 Documents in Project
Summary
SCH Number
2016072038
Lead Agency
California State Lands Commission
Document Title
Mallard Farms Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2016
Present Land Use
MP- Marsh Protection
Document Description
Continued use and maintenance of an existing 8-inch diameter refined petroleum products pipeline, abandonment in place of pipeline segments, construction of a temporary work platform, installation of temporary pilings and buoys, and installation of a new horizontal directionally drilled 8-inch diameter pipeline, 75 feet below ground, and within a 50-foot wide right-of-way. The decommissioned and abandoned in-place segments of pipeline will remain under lease, with Chevron maintaining liability. The state Lands Commission action is an approval of a 25-year General Lease - Right-of-Way Use beginning Oct. 13, 2016, through Oct. 12, 2041.
Contact Information
Name
Alan Franzoia
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Cities
Suisun City
Counties
Solano
Cross Streets
Grizzly Island Rd
Zip
94585
Parcel #
0046-240-040, 0090-050-280
Railways
Freight/Commuter
Schools
Shore Acres ES
Waterways
Honker Bay
Township
3N
Range
1W
Section
24
Base
MD
Notice of Determination
Approving Agency
CA State Lands Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.