Palm Production Well (#N6A) and Pumping Plant
2 Documents in Project
Summary
SCH Number
2016072009
Lead Agency
Sacramento Suburban Water District
Document Title
Palm Production Well (#N6A) and Pumping Plant
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Urban development area
Document Description
The purpose of the project is to replace the Palm Production Well (#N6) with a new well (#N6A) equipped with pumping facilities. The existing well has been found to have casing failure and poor water quality, and rather than invest additional resources in this aging well, the District intends to replace the well with anew well. The site is approximately 46,000 sf in size, or 1.05 acres. Approximately 7,000 sf of the site is already developed with asphalt paving and delineated by fencing. The proposed project will take place within the existing fenced area.
Contact Information
Name
Robert S. Roscoe
Agency Name
Sacramento Suburban Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Cross Streets
Palm Avenue, Auburn Blvd, Garfield Ave
Zip
95628
Total Acres
1.05
Parcel #
230-0021-001
State Highways
I 80
Airports
McClellan Airport
Schools
La Entrada HS
Waterways
Arcade Creek
Township
10N
Range
5E
Section
52
Base
Citrus
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Water Facilities (Type well and pumping, MGD 2.16)
Local Actions
Site Plan, Water Supply
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Transportation
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.