Bayshore Bikeway - Segment 8B Project
2 Documents in Project
Summary
SCH Number
2016071079
Lead Agency
San Diego Association of Governments
Document Title
Bayshore Bikeway - Segment 8B Project
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2016
Document Description
The proposed project is located in south San Diego Bay area within the cities of San Diego and Chula Vista. The proposed bicycle facility would extend a distance of approximately 0.25 mile adjacent to Bay Blvd between Palomar St and the main entrance to the South Bay Salt Works. The proposed bike path would include an eight ft wide travel lane with two to three ft wide shoulders. Additional improvements would include installation of a new storm drain inlet and culvert just north of Palomar St, curb and gutter, railing along the east side of the deck, lighting, minor grading, bike lane striping, utilities improvements and relocations, and other improvements as required through permits.
Contact Information
Name
Lauren Esposito
Agency Name
San Diego Association of Governments
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Chula Vista, San Diego
Counties
San Diego
Cross Streets
Palomar St/Bay Blvd
Zip
91911
Total Acres
1.9
Parcel #
621-010-04
State Highways
SR 75
Railways
San Diego/AZ Eastern
Schools
Harborside ES
Waterways
San Diego Bay
Township
18S
Range
2W
Section
16
Base
Imperial
Notice of Determination
Approving Agency
San Diego Association of Governments
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.